Development Projects

PROJECTS FUNDED BY HEC DURING 2001-2010 (Completed)

Sr# Name of Project Starting Year Cost of Project (M) Rs
1 Development of University of Engg and Technology, Lahore (Phase-II) 2001-02 3.543
2 Extension /Development of Chemical Engineering dept. 2001-02 26.889
3 Strengthening of Mechatronics Lab & Library of MED 2001-02 39.889
4 Setting Up of Digital Signal Processing Laboratory at UET, Lahore 2001-02 39.762
5 Extension of Computer Science Department of UET, Lahore. 2001-02 39.762
6 Development of University of Engg. & Technology, Lahore ( Phase-III) 2003-04 4.050
7 Establishment of Telecommunication Laboratory at UET, Lahore 2001-02 39.570
8 Upgradation/Strengthening of UET Library into National Library of Eng. Sciences 2002-03 39.995
9 Computerization & Net Working Enhancement at UET, Lahore. 2003-04 31.762
10 Scheme for Development of Centre for Repair & Maintenance of Scientific Instruments at UET, Lahore. 2003-04 19.440
11 Setting up of Polymer Engineering Labs. And Library at Chemical Engineering Deptt. At UET, Lahore. 2004-05 39.781
12 Scheme for setting up of Geological Engineering Labs. and Library at UET, Lahore. 2003-04 36.022
13 Establishment of Hi-Tech Laboratory at UET Main 2005-06 38.000
14 Acquisition of Land for Establishment of KSK Campus of UET, Lahore. 2004-05 308.200
15 Setting up of Architectural Engg Labs. Studios and Library at Architecture Department UET, Lahore. 2004-05 37.814
16 Scheme for Establishment of Manufacturing Technologies Development Centre at UET Lahore 2004-05 120.000
17 Establishment of Students Services Centre, UET, Lahore. 2005-06 32.740
18 Site Development of Faisalabad Campus of UET, Lahore 2005-06 37.850
19 Strengthening of Met. and Materials Engineering Dept. 2005-06 35.900
20 Hostel for visiting Faculty at UET, Lahore 2005-06 19.622

Total

990.591

Govt. of Punjab Funded Development Projects Completed during 2000-2010

1

Software Engineering Centre 2000 7.000

2

Al-Khawarizmi Institute of Computer Science 2003 96.583

3

Construction of Girls Hostel at UET Main 2007 26.100

4

Block Allocation of Rs. 2.00 Billion 2006-07
  1. Construction of Lecture Theatres and Convocation Hall Complex
  2. Construction of Hostel for 150 Students at KSK Campus
  3. Construction of Hostel for 150 Students at FSD Campus
  4. Strengthening of Labs at RCET
April 2010
Dec 2008
Dec 2008
Sep 2010
53.532
35.650
35.800
40.000

5

Block Allocation of Rs.4.00 Billion 2007-08
  1. Establishment of Dept. Of Product & Industrial Design
  2. Acquisition of Land for extension of RCET
Aug 2008 34.299
36.508

Total

365.472

Ongoing Development Projects

Development of UET Main Phase-I HEC Funded-Approved in 2005

Description

Allocation

Expenditure

Remarks

Civil Works 126.00 126.820 Completed
Lab. Equipment 224.00 223.000 Completed
Faculty Development 130.00 100.000 In Progress
Books & Journals 2.50 1.443 In Progress
Furniture 7.00 2.974 In Progress
Contingencies 3.50 1.114

Total

493.00

455.671

Development of KSK City Campus Phase-I (On going) (HEC Funded-Approved 2005)

Description

Allocation

Expenditure

Remarks

Civil Works 145.00 148.781 Completed
Buildings of Common Facilities 75.00 69.447 Completed
Site Development 22.00 22.000 Completed
Lab. Equipment 118.00 118.000 Completed
Faculty Development 120.00 102.600 In Progress

Total

480.00

462.035

Development of Faisalabad Campus Phase-I (HEC Funded-Approved in 2006)

Description

Allocation Rs. (M)

Expenditure Rs. (M)

Remarks

Civil Works 231.396 184.000
In Progress
Lab Equipment 122.000 101.360
In Progress
Faculty Development 111.600 72.734
In Progress
Books & Journals 2.000 1.985 In Progress
Furniture 6.000 2.200 In Progress
Contingencies 3.000 1.100 In Progress

Total

475.996

363.379

Mega Development Project

Strengthening of University of Engineering & Technology Lahore(HEC Funded) Approved by ECNEC on 12-11-2007

Description

UET-Main

KSK Campus

FSD Campus

RCET G/wala

TOTAL (Rs : M)

Civil Works 460 875 685 186

2206

Lab. Equipment 910 232 360 78

1580

Faculty Dev. 805 476 483 154

1918

Books & Journals 25 15 10 5

55

Furniture 15 20 15 5

55

Transport 30 15 15 15

75

Contingencies 15 10 10 5

40

Total

2260

1643

1578

448

5929

Detail of Strengthening of University of Engineering & Technology, Lahore

Description

Allocation

Expenditure

Remarks

Civil Works 2206.000 782.179
In Progress
Lab. Equipment 1580.000 169.795
In Progress
Faculty Development 1918.000 374.205
In Progress
Books & Journals 55.000 7.631 In Progress
Furniture 55.000 10.088 In Progress
Transport 75.000 74.500 In Progress
Contingencies 40.000 3.788

Total

5929.000

1422.186

Total Development Funds Allocated (2000-2010)

S#

Funding Agency

Allocation ( Rs. In Million)

Status

1

HEC-Small & Medium Projects 990.591 Completed

2

Government of the Punjab-Small projects 365.472 Completed

3

Misc. Projects-Externally & Internally Funded 1567.870 Completed

4

HEC MEGA Projects

5

Development of UET Main 493.000 Near Completion

6

Establishment of KSK Campus 480.000 Near Completion

7

Establishment of FSD Campus 475.996 In Progress

8

Strengthening of UET Lahore 5929.000 In Progress

GRAND TOTAL

10291.929